Dumat Al-Jandal Wind Farm is the first wind farm in the Kingdom of Saudi Arabia, located in Dumat Al-Jandal in the Al-Jouf region, northwest of Saudi Arabia, about 1046 km north of the capital Riyadh. The cost of the Dumat Al-Jandal wind power plant is $ 500 million, and after the construction works are completed, the station will be able to generate sustainable energy sufficient for about 70,000 housing units. The "Dumat Al-Jandal" project was chosen as the first wind energy project in Saudi Arabia, after studies showed a strong mixture of wind capabilities at the project site, so that the expected average production for the wind station is about 1.4 Terawatts.[1][2][3][4]

The project was granted based on the standard cost of electricity, which equals 2.3 cents per kilowatt hour, which was a new record for a project of this kind in Europe, the Middle East and Africa. Dumat Al-Jandal wind farm will provide electric power according to a 20-year energy purchase agreement with the Saudi Energy Purchase Company, a subsidiary of the Saudi Electricity Company, the agency responsible for generating and distributing energy in Saudi Arabia.[5][6]

The Deal of the Year award for the renewable energy sector in the Middle East and Africa 2019[change | change source]

Dumat Al-Jandal wind farm project won the Best Renewable Project by Project Finance International (PFI) in the Middle East and Africa for the year 2019. After the project achievement of a new record of recording the lowest standard electricity generation rate of $ 0.0199 per kWh.[7][8]

The beginning of the project[change | change source]

Work began on the farm in the middle of the calendar year 2019, and it is expected that the project will start generating energy in the last quarter of 2020, and work on the project will end in 2022.[9][10]

References[change | change source]

  1. "المملكة تمنح أول مشروع لإنتاج طاقة الرياح بـ«دومة الجندل» - المدينة". web.archive.org. 5 February 2019. Archived from the original on 5 February 2019. Retrieved 27 July 2020.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  2. "تفاصيل مشروع دومة الجندل الخاص بطاقة الرياح". Archived from the original on 2019-07-18. Retrieved 2020-07-27.
  3. "مجلة الخليج للإنشاء". www.gcarabic.com. Archived from the original on 2020-06-08. Retrieved 2020-07-27.
  4. "الخبر". moee.gov.eg.
  5. "'رياح دومة الجندل' الأكبر في الشرق الأوسط". صحيفة مكة. 16 January 2019.
  6. "السعودية تتوسع في الطاقات المتجددة لزيادة صادراتها النفطية". MEO. 17 March 2018. Archived from the original on 8 June 2020. Retrieved 27 July 2020.
  7. "Saudi- Dumat Al-Jandal Wind Farm Project Wins PFI Award - REVE News of the wind sector in Spain and in the world".
  8. "Dumat Al-Jandal Wind Farm Project Wins PFI Award". Eyeofriyadh.com.
  9. "أمير الجوف يطلع على مراحل بدء مشروع طاقة الرياح بدومة الجندل". 9 December 2019. Archived from the original on 8 June 2020. Retrieved 27 July 2020.
  10. "Work to Begin on 400-megawatt Dumat Al Jandal Wind Power Facility in Saudi Arabia - SUSTG.com – News, Analysis, and Features on all things Saudi Arabia".