Thomson–East Coast MRT line
(Redirected from Thomson-East Coast MRT Line)
Jump to navigation
Jump to search
![]() ![]() Thomson–East Coast line | |||
---|---|---|---|
![]() Woodlands MRT station concourse | |||
Overview | |||
Status | Under construction | ||
Owner | Land Transport Authority | ||
Termini | Woodlands North Sungei Bedok | ||
Stations | 31 (under construction) | ||
Service | |||
Type | Rapid transit | ||
System | Mass Rapid Transit (Singapore) | ||
Services | 1 | ||
Operator(s) | SMRT Trains (SMRT Corporation) | ||
Depot(s) | Mandai East Coast (Future) | ||
Rolling stock | CT251 | ||
Daily ridership | 500,000 (expected) | ||
History | |||
Planned opening | 2020 (Stage 2) 2021 (Stage 3) 2023 (Stage 4) 2024 (Stage 5) 2027 (Founders' Memorial MRT station) 2040 (extension to Changi Airport) | ||
Opened | 31 Jan 2020 (Stage 1) | ||
Technical | |||
Line length | 43 km (27 mi) | ||
Character | Fully Underground | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Electrification | 750 V DC Third Rail[1] | ||
Operating speed | 90 km/h (56 mph) | ||
|
The Thomson-East Coast Line (TEL) is the sixth MRT line in Singapore. It is the fourth line to be fully automated and driverless in Singapore. The line will be 43 km (27 mi) long, with 31 stations. The line is colored brown on the MRT Rail map.
The Thomson Line section was announced on 29 August 2012. The Eastern Region Line section was announced on 15 August 2014. Both were put together to form the Thomson-East Coast Line.
The first stage of the line opened on 31 January 2020, with the other four stages expected to open from 2020 to 2024. It interchanges with all existing lines. When the first three stages are opened, it is expected to serve about 500,000 commuters daily.
Stations[change | change source]
Station Number | Station Name | Interchange/Notes | |
Stage 1 | |||
---|---|---|---|
TE1 | Woodlands North | ||
TE2 NS9 | Woodlands | North South line | |
TE3 | Woodlands South | ||
Stage 2 (under construction) | |||
TE4 | Springleaf | ||
TE5 | Lentor | ||
TE6 | Mayflower | ||
TE7 | Bright Hill | ||
TE8 | Upper Thomson | ||
TE9 CC17 | Caldecott | Circle line | |
Stage 3 (under construction) | |||
TE10 | Mount Pleasant | ||
TE11 DT11 | Stevens | Downtown line | |
TE12 | Napier | ||
TE13 | Orchard Boulevard | ||
TE14 NS22 | Orchard | North South line | |
TE15 | Great World | ||
TE16 | Havelock | ||
TE17 EW16 NE3 | Outram Park | East West line North East line | |
TE18 | Maxwell | ||
TE19 | Shenton Way | ||
TE20 NS27 CE2 | Marina Bay | North South line Circle line | |
TE21 | Marina South | ||
TE22 | Gardens by the Bay | ||
Stage 4 (under construction) | |||
TE23 | Tanjong Rhu | ||
TE24 | Katong Park | ||
TE25 | Amber | ||
TE26 | Marine Parade | ||
TE27 | Marine Terrace | ||
TE28 | Siglap | ||
TE29 | Bayshore | ||
Stage 5 (under construction) | |||
TE30 | Bedok South | ||
TE31 DT37 | Sungei Bedok | Downtown line |