Brickland MRT station
Appearance
NS3A
Brickland 红砖 பிரிக்லேன்ட் Brickland | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
General information | |||||||||||
Owned by | Land Transport Authority | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | NS3A | ||||||||||
History | |||||||||||
Opening | mid-2030s | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
|
Brickland MRT station (NS3A) is a future Mass Rapid Transit station on the North South line in Choa Chu Kang, Singapore.[1]
History
[change | change source]The station was first announced on 25 May 2019 as part of the Land Transport Authority's (LTA) Land Transport Master Plan 2040.[2]
References
[change | change source]- ↑ "Two new MRT stations for North-South Line by mid-2030s; potential new rail line being studied as part of Land Transport Master Plan". The Straits Times. 25 May 2019.
- ↑ "Land Transport Master Plan 2040: Bringing Singapore Together | Press Room | Land Transport Authority". www.lta.gov.sg. Retrieved 2019-05-26.