Thameslink and Great Northern

From Wikipedia, the free encyclopedia
Jump to: navigation, search
Thameslink and Great Northern
319373 and 319 number 438 to Sevenoaks 2E45 by Train Photos.jpg
Franchise(s): Thameslink, Southern and Great Northern
14 Sep 2014 - 2021
Main region(s): London, Bedfordshire, Cambridgeshire, Hertfordshire, Sussex
Other region(s): Norfolk, Surrey, Kent
Stations called at: 129 (approx)
Stations operated: 77
Route km operated: 778.9
National Rail abbreviation: TL (Thameslink)
GN (Great Northern)
Parent company: Govia (Go-Ahead and Keolis)
Web site:
Route map

Route map

Thameslink and Great Northern is a train company managed by Go-Ahead and Keolis that run the Thameslink line and the Great Northern routes.[1] The routes were previously operated by First Capital Connect.[2]

References[change | change source]

  1. "Govia wins TSGN franchise, beating FirstGroup". Rail Technology. 23 May 2014. Retrieved 23 May 2014. 
  2. "Govia chosen for new Thameslink contract". Railnews. 23 May 2014. Retrieved 23 May 2014.